Fewer breakdowns, fewer rejects, plans that hold

AI agents for manufacturers that watch machine data for early signs of failure, record quality checks as they happen, re-plan when an order changes and reorder material before the line stops. They read from the ERP, PLCs and maintenance logs you already have.

Maintenance · Quality · Planning · Materials · OEE

01 In short

What does Exyconn build for manufacturing?

AI for manufacturing is a set of agents that reads machine, quality and stock data from the shop floor and turns it into maintenance alerts, inspection records, production plans and purchase requests, so supervisors and planners act on today's data instead of last week's. Exyconn designs, builds and runs these agents on your ERP, your PLC or SCADA data, your maintenance records and the WhatsApp groups your shift teams already use. Engineers and quality heads still make the calls on stopping a line or releasing a lot.

Why manufacturers are doing this now

  • Many machines already log temperatures, cycle times and alarms through their PLCs. Most of that data is never looked at.
  • An unplanned breakdown on a bottleneck machine costs the whole shift's output, not just the repair.
  • Customers and auditors ask for traceable inspection records, and paper check sheets are slow to search.
  • Order books change weekly. Plans built once a month in a spreadsheet can't keep up.
  • Experienced supervisors are retiring, and what they know about each machine is rarely written down.

Suresh, the hydraulic oil temperature on Press 4 has been climbing for three days and is now well above its usual range at full load. Last time this pattern showed, the cooler fan motor was failing.

What's running on it today?

Bracket part BR-220 for the Pune customer, 2,400 pieces left on the order, due Friday. Press 6 can run the same die but is free only after 4pm.

Ok. Book a 1 hour stop at shift change and move the rest to Press 6

Done. Work order raised for the cooler fan with the spare from stores, the planner has been told, and the production plan now shows BR-220 on Press 6 from 4pm. I'll check temperatures again after the repair.

The agent spots a rising temperature trend on a press, alerts the maintenance engineer and helps book a stop between shifts.

02 The reality

Where a plant's hours actually go

Talk to a plant head about a bad week and the same causes come up. Few of them are a surprise in hindsight.

03 Use cases

Six jobs AI takes off your team's plate

04 A day with it running

One day at an auto-component plant running three shifts

Follow a normal Wednesday. Each moment lights the part of the plant the agent is working on.

  1. 06:15

    The night shift, in numbers

    OEE per machine, output against plan and the top three downtime reasons from the night shift are on the plant head's phone before the morning meeting.

  2. 08:00

    The safety walk is logged

    The shift in-charge completes the checklist in chat. A blocked fire exit near the paint shop is photographed and assigned to facilities with a deadline.

  3. 10:40

    A dimension starts drifting

    Bore diameters on a CNC cell are trending towards the upper limit. The quality engineer is alerted with the last 20 readings and stops the cell for a tool change.

  4. 13:30

    A rush order is fitted in

    A customer pulls an order forward by a week. The agent proposes a revised plan that moves two jobs, and the planner approves it before the second shift starts.

  5. 16:20

    Steel ordered before the shortage

    The revised plan needs more coil than is in stock or on order. A purchase requisition is raised for approval and the usual supplier is asked to confirm a date.

  6. 21:50

    A spindle sounds wrong

    Vibration on a grinding machine has crossed the level seen before its last bearing failure. A work order is raised for the next planned stop and the spare is reserved.

05 How it connects

Built on the systems you already run

Built on the systems you already run Where the floor talks: Machines & PLCs, Shop-floor tablets, WhatsApp groups. AI agents: Maintenance watch, Quality desk, Planning desk. Your systems: ERP, MES / SCADA, Maintenance CMMS. People in charge: Shift sign-off, QC release, Audit log Where the floor talks Machines & PLCs Shop-floor tablets WhatsApp groups AI agents Maintenance watch Quality desk Planning desk Your systems ERP MES / SCADA Maintenance CMMS People in charge Shift sign-off QC release Audit log
Built on the systems you already run

06 By plant

What it looks like for your kind of plant

Tally, Excel and a few key machines

MSME workshops

Smaller plants often have no MES and limited machine data. We start with what exists: operator inputs on a phone, stock in your accounting or ERP, and simple sensors on the one or two machines that hurt most when they stop.

  • Downtime and output logged from the floor in chat
  • Stock and purchase reminders from your books
  • Sensors added only where a machine justifies it

OEM schedules and strict quality

Auto & engineering suppliers

Delivery schedules from OEMs change often, and quality records must trace to the lot. Agents tie planning to customer schedules and keep inspection data searchable for audits and complaints.

  • Re-planning against changing customer schedules
  • Traceable inspection records by lot and shift
  • Machine-level OEE and downtime reasons

Continuous lines and several sites

Process & multi-plant

In process plants, unplanned stops are costly and batch records matter. Agents watch historian data for early warnings and roll up output, energy and quality across plants for head office.

  • Early warnings from historian and SCADA data
  • Batch and quality records compiled automatically
  • Cross-plant output and loss reporting

07 Rollout

From one line to the whole plant

We start on the line or machine where losses are highest, prove the result there, then extend.

  1. 01 · Weeks 1–2

    Walk the plant

    We spend time on the floor, look at downtime and reject records, list your ERP, machine data and maintenance systems, and pick the first line with you.

  2. 02 · Weeks 3–6

    Connect one line

    Machine data, operator inputs and quality checks from one line are connected, and the first alerts and shift reports go to supervisors for review.

  3. 03 · Weeks 7–12

    Planning, materials and safety

    Production planning, material reorders and safety records are added, and more lines are connected as each one is proven.

  4. 04 · Ongoing

    Run and improve

    We tune alert thresholds with your maintenance team, add new failure patterns as they occur and review results with the plant head each month.

08 Related

09 FAQ

Questions manufacturers ask us

Will this replace our maintenance, quality or planning staff?

No. The agents watch data and handle the paperwork so your engineers can act sooner. Stopping a line, releasing or rejecting a lot and approving purchases remain decisions for named people.

Our machines are old. Can we still do predictive maintenance?

Often, yes. Machines with PLCs usually expose some data already. For older machines, add-on vibration, temperature or current sensors can be fitted. We start with the machines whose breakdowns cost you most and only add hardware where it pays for itself.

Which ERP and shop-floor systems do you connect to?

We work with ERPs and accounting systems such as SAP, Microsoft Dynamics, Oracle and Tally, along with MES, SCADA historians and maintenance software, through their APIs, databases or exports. In the first weeks we confirm what each system exposes and agree read and write access with your IT team.

Is our production data safe?

Machine and production data stays in your network or an environment set up for your company. Shop-floor connections are read-only unless agreed, access is role-based and every action is logged. Personal data of workers is handled under India's DPDP Act 2023 or the GDPR where it applies.

Can operators use it in their own language?

Yes. Operators and supervisors can send updates and ask questions by voice or text in Hindi, English and other Indian languages, and get replies in the same language.

How much does it cost?

It depends on the number of machines, lines and systems, and whether sensors are needed. Most plants start with one line. Tell us about your plant and we'll send a fixed quote for that first phase.

Next step

Share three months of downtime records

We'll show which losses an agent could have flagged earlier and what data your machines already provide to do it. No obligation.